TEMPORARY WASTEWATER TREATMENT SYSTEM

Client: Federal contractor, Hereford Township, PA

Brownfield Science & Technology, Inc. (BSTI) coordinated a cost-effective teaming approach to provide a Temporary Groundwater Treatment System to treat trichloroethylene (TCE) impacted groundwater generated during deep well drilling and hydrostatic testing.

The Federal Superfund site is approximately 200 acres of farmland in remote Hereford Township, PA. A portion of the land was once used for dumping various wastes, resulting in a TCE contaminated groundwater plume. BSTI was subcontracted by a USEPA contractor to assist with several phases of the project using four Indefinite Delivery/Indefinite Quantity (IDIQ) contracts funded through the American Recovery and Re-investment Act (ARRA).

The 100 gpm treatment unit included filtration, batch storage, process controls and carbon adsorption in support of well field installation by the lead contractor. BSTI personnel provided the treatment equipment, assembly, operation and operator training.

The treatment unit was instrumental in allowing the deep well network to be installed without downstream process complication or delay.  Further, by eliminating the need to transport the groundwater off-site, the on-site treatment unit lowered the overall cost of the project.

Latest Case Studies

npl site usepa requirements

HYDROGEOLOGIC DATA VISUALIZATION

Project: NPL Site, Bulk Chemical Transporter, NJ Download our Hydrogeologic Data Visualization Conceptual Site Model here: Hydrogeologic Data Visualization CSM Objectives:  Synthesize decades of multimedia environmental

Read More »
PFAS investigations

PFAS Investigation AK Case Study

  Project: United States Department of Defense, AK Download our PFAS Investigation AK project here: PFAS Investigation AK Case Study Objectives: Map PFAS presence and migration

Read More »